Facilities
75,000 m² of manufacturing capacity
Three integrated facilities across Dammam, Eastern Province.

45,000 m²
2nd Industrial City — Headquarters
Primary manufacturing campus housing VTL, HBM, 5-axis CNC, chrome plating, balancing, and heavy fabrication.
- VTL bay
- Chrome plating line
- Balancing lab
- Heavy fabrication hall

18,000 m²
Dammam Industrial City
Specialized facility for equipment overhauling, pump and blower rebuilds, and rotor repair operations.
- Pump overhaul bay
- Rotor repair center
- Test stands
- Assembly hall

12,000 m²
Khodhariyah Industrial Area
Foundry, heat treatment, and large casting operations supporting the group's integrated manufacturing chain.
- Foundry
- Heat treatment furnaces
- Pattern shop
- Quality lab

Ready to localize your supply chain?
Submit your drawings and specifications. Our engineering team responds within 48 hours with a technical and commercial proposal.