2023Energy
ARAMCO Turbine Wheel Program
Localization of 4.2m gas turbine wheels previously imported from Europe. Full material certification and performance validation.
Mission-critical components manufactured and delivered across the Kingdom.
2023Energy
Localization of 4.2m gas turbine wheels previously imported from Europe. Full material certification and performance validation.
2022Marine
Complete propeller shaft manufacturing line for offshore supply vessels — from forging coordination to final balancing.
2024Aerospace
AS9100-certified production of aircraft structural brackets and engine mount components for MRO operations.
2023Petrochemical
Full overhaul of multi-stage centrifugal compressors including rotor repair, balancing, and performance restoration.
2022Mining
Reverse-engineered and manufactured crusher rotor assembly, replacing discontinued OEM parts.
2024Oil & Gas
Precision machining of downhole tool bodies and pressure-containing components to API specifications.

Submit your drawings and specifications. Our engineering team responds within 48 hours with a technical and commercial proposal.